The following forms must be completed and returned to the Department of Labor and Industry so an electrical inspection may be scheduled and performed without delay.
| Portable and temporary power documents |
| Transitory electrical inspection forms packet (these forms can be filled out and saved to your computer) |
| Affidavit of amusement ride inspection |
|
|
| Information about regulation of amusement rides and temporary electrical power distribution |
| The requirements for portable and temporary electrical power distribution (Brochure is printable on 8.5" X 14" paper) |
| Minnesota Statute 184 "Regulation of Amusement Rides" |
|
|
View information about filming in
Minnesota and electrical safety requirements